21624
| * | Non-Agenda Reports | 10122026 Engineering, Operations, and Technology Committee Translated Agendas | | |
Not available
|
Not available
|
|
21-6243
| A. | Minutes | Approve the Minutes of the Engineering, Operations, and Technology Committee held on September 14, 2026 | | |
Not available
|
Not available
|
|
21-6235
| 7-1 | Board Letter for Consent | Award a $374,450 contract to The Quality Plus Group to replace the fuel dispensing system at the Hinds Pumping Plant; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA
| | |
Not available
|
Not available
|
|
21-6236
| 7-2 | Board Letter for Consent | Authorize an increase of $1.4 million to an agreement with IDS Group Inc. for a new not-to-exceed total amount of $1.8 million for final design to rehabilitate the heating, ventilation, and air conditioning system at the Metropolitan Headquarters Building; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA | | |
Not available
|
Not available
|
|
21-6233
| 8-1 | Board Letter for Action | Authorize agreements with HDR Inc., Tetra Tech, Geosyntec Consultants Inc. and Arcadis U.S. Inc., in amounts not to exceed $3 million each, in support of board-authorized Capital Investment Plan projects; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA | | |
Not available
|
Not available
|
|
21-6234
| 8-2 | Board Letter for Action | Award a $14,475,037 contract to Kiewit Infrastructure West Co. to replace the canal concrete liner at 25 locations along the Colorado River Aqueduct; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA | | |
Not available
|
Not available
|
|
21-6244
| a. | Manager Report | Engineering Services activities
Information Technology activities
Water System Operations activities | | |
Not available
|
Not available
|