21-2113
| A. | Oral Presentation Only | Report from Subcommittee on Pure Water Southern California and Regional Conveyance | | |
Action details
|
Video
|
21-2080
| A. | Minutes | Approval of the Minutes of the Engineering, Operations, and Technology Committee for March 13, 2023 (Copies have been submitted to each Director, Any additions, corrections, or omissions)
| | |
Action details
|
Video
|
21-2053
| 7-1 | Board Letter for Action | Adopt CEQA determination that the proposed action was previously addressed in the Mitigated Negative Declaration and related CEQA actions, and award an $8,656,568 contract to Granite Construction Company for construction of structural protection measures at 24 cut-and-cover conduit locations along the Colorado River Aqueduct; authorize agreements with: (1) Environmental Science Associates in an amount not to exceed $1,200,000 for biological surveys and environmental monitoring; and (2) Deto, Inc. in an amount not to exceed $325,000 for compensatory environmental mitigation credits
| | |
Action details
|
Video
|
21-2057
| 7-2 | Board Letter for Action | Award a $6,174,000 contract to West Valley Investment Group for seismic upgrades to the Foothill Hydroelectric Plant and Control Building; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA | | |
Action details
|
Video
|
21-2056
| 7-3 | Board Letter for Action | Authorize an agreement with Stantec Consulting Services, Inc. in an amount not to exceed $900,000 for a detailed seismic analysis of the Lake Skinner outlet tower; and award a $1,174,475 procurement contract to B&K Valves and Equipment, Inc. for the replacement of two valves at the Lake Skinner outlet tower; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA | | |
Action details
|
Video
|
21-2054
| 7-4 | Board Letter for Action | Authorize an increase of $475,000 to an agreement with Brown & Caldwell, for a new not-to-exceed amount of $715,000, to investigate potential modifications to Metropolitan’s existing East-West conveyance and distribution system; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA | | |
Action details
|
Video
|
21-2058
| 7-5 | Board Letter for Action | Authorize an increase of $5.4 million to an existing agreement with Arcadis U.S., Inc., for a new not-to-exceed total amount of $6.35 million, for engineering design services to rehabilitate Garvey Reservoir; the General Manager has determined that this proposed action is exempt or otherwise not subject to CEQA | | |
Action details
|
Video
|
21-2059
| 7-6 | Board Letter for Action | Authorize an agreement with Canary Systems California, LLC, for an amount not to exceed $1.95 million to upgrade the data acquisition systems at Diamond Valley Lake and Garvey Reservoir; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA | approved | Pass |
Roll call
|
Video
|
21-2081
| a. | Oral Presentation Only | Annual Seismic Resilience Update [REVISED SUBJECT 4/3/23]
| | |
Action details
|
Video
|
21-2087
| b. | Oral Presentation Only | Jensen Operating Capacity Analysis | | |
Action details
|
Video
|
21-2082
| c. | Oral Presentation Only | Update on Jensen Reliability Projects | | |
Action details
|
Video
|
21-1986
| d. | Oral Presentation Only | Quarterly Cybersecurity Update [Conference with Metropolitan Director of Info Tech Services, Information Technology, Jacob Margolis, or designated agents on threats to public services or facilities; to be heard in closed session pursuant to Gov. Code Section 54957(a)] | | |
Action details
|
Video
|
21-2076
| a. | Manager Report | Water System Operations Manager's Report | | |
Action details
|
Not available
|
21-2077
| b. | Manager Report | Engineering Services Manager's Report | | |
Action details
|
Not available
|
21-2078
| c. | Manager Report | Information Technology Manager's Report | | |
Action details
|
Not available
|