21-4503
| A. | Minutes | Approval of the Minutes of the Engineering, Operations, and Technology Committee for April 7, 2025 | | |
Not available
|
Not available
|
21-4490
| 7-2 | Board Letter for Action | Amend the Capital Investment Plan for Fiscal Years 2024/25 and 2025/26 to include the ozone contactor expansion joint improvements at the F.E. Weymouth Water Treatment Plant; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA | | |
Not available
|
Not available
|
21-4492
| 7-3 | Board Letter for Action | Authorize on-call agreements with Hazen and Sawyer, Jacobs Engineering Group, Inc., and Mott MacDonald Group Inc. in amounts not to exceed $1 million each to support engineering planning for water system resiliency and energy planning projects; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA | | |
Not available
|
Not available
|
21-4493
| 7-4 | Board Letter for Action | Award a $457,498 construction contract to IPI Construction to upgrade the heating, ventilation, and air conditioning systems in the control rooms at the Joseph Jensen Water Treatment Plant; the General Manager has determined that the proposed action is categorically exempt or otherwise not subject to CEQA | | |
Not available
|
Not available
|
21-4489
| 8-1 | Board Letter for Action | Award a $131 million procurement contract to Siemens Energy Inc. to furnish 35 high voltage power transformers; authorize the General Manager to execute change orders for the CRA transformer procurement contract up to an aggregate amount not to exceed $42.5 million; and authorize an increase of $6.5 million to an agreement with HDR Engineering Inc. for a new not-to-exceed amount of $8.2 million for final design services to replace the high-voltage transformers at the five CRA pumping plants; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA | | |
Not available
|
Not available
|
21-4491
| 9-5 | Board Letter for Information | Colorado River Aqueduct High Voltage Transmission System – Affected Systems Mitigation Agreements | | |
Not available
|
Not available
|
21-4535
| a. | Oral Presentation Only | Colorado River Aqueduct Operations | | |
Not available
|
Not available
|
21-4504
| b. | Oral Presentation Only | Update on Surface Water Storage Study | | |
Not available
|
Not available
|
21-4506
| c. | Oral Presentation Only | Quarterly Cybersecurity Update
[Conference with Metropolitan Director of Info Tech Services, Information Technology, Jacob Margolis, or designated agents on threats to public services or facilities; to be heard in closed session pursuant to Gov. Code Section 54957(a)] | | |
Not available
|
Not available
|
21-4507
| a. | Oral Presentation Only | Engineering Services activities
Information Technology activities
Water System Operations activities
| | |
Not available
|
Not available
|