Legislation Details

File #: 21-407   
Type: Board Letter for Consent Status: Passed
File created: 8/13/2021 In control: Engineering and Operations Committee
On agenda: Final action: 9/14/2021
Title: Authorize an agreement with HDR Engineering, Inc., in an amount not to exceed $635,000 for engineering design services to upgrade the 2.4 kV power line that serves the Black Metal Mountain communications site; the General Manager has determined that this proposed action is exempt or otherwise not subject to CEQA
Sponsors: EO
Attachments: 1. 09142021 EO 7-3 B-L.pdf, 2. 09142021 EO 7-3 Presentation.pdf

title

Authorize an agreement with HDR Engineering, Inc., in an amount not to exceed $635,000 for engineering design services to upgrade the 2.4 kV power line that serves the Black Metal Mountain communications site; the General Manager has determined that this proposed action is exempt or otherwise not subject to CEQA

end