<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>The Metropolitan Water District of So. California - File #: 21-4766</title><link>https://mwdh2o.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=7440808&amp;GUID=67BE98BB-0C66-4F6B-9182-8F0AC96B0873</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://mwdh2o.legistar.com/Feed.ashx?M=LD&amp;ID=7440808&amp;GUID=67BE98BB-0C66-4F6B-9182-8F0AC96B0873" rel="self" type="application/atom+xml" /><item><title>The Metropolitan Water District of So. California - File #: 21-4766</title><link>https://mwdh2o.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=7440808&amp;GUID=67BE98BB-0C66-4F6B-9182-8F0AC96B0873</link><guid isPermaLink="false">67BE98BB-0C66-4F6B-9182-8F0AC96B0873-2025-07-25-16-21-48</guid><description>Title: Authorize (1) an amendment to an existing design-build agreement with J.F. Shea Construction Inc. to initiate Phase 2 of the Sepulveda Pump Stations project, including a $52.96 million increase for a new not-to-exceed amount of $103.36 million; (2) an increase of $810,000 to an existing agreement with Carollo Engineers Inc. for a new not-to-exceed amount of $3.3 million to serve as the owner’s advisor; and (3) an increase of $296,000 to an existing agreement with Parametrix Inc. for a new not-to-exceed amount of $545,000 for cost estimating and scheduling services; the General Manager has determined that the proposed action is categorically exempt or otherwise not subject to CEQA. [MOVED ITEM 7-3 FROM CONSENT TO ACTION on 6/25/2025]</description><pubDate>Fri, 25 Jul 2025 16:21:48 GMT</pubDate></item></channel></rss>