<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>The Metropolitan Water District of So. California - File #: 21-6057</title><link>https://mwdh2o.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8134251&amp;GUID=9B656F01-AE20-4680-9B47-7F0AA5A63578</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://mwdh2o.legistar.com/Feed.ashx?GUID=9B656F01-AE20-4680-9B47-7F0AA5A63578&amp;ID=8134251&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>The Metropolitan Water District of So. California - File #: 21-6057</title><link>https://mwdh2o.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8134251&amp;GUID=9B656F01-AE20-4680-9B47-7F0AA5A63578</link><guid isPermaLink="false">9B656F01-AE20-4680-9B47-7F0AA5A63578-2026-08-03-22-03-10</guid><description>Title: Authorize a $29,214,000 agreement with PCL Construction West Coast Inc. for Phase 1 progressive design-build services for the Lake Mathews Pressure Control Structure and Electrical System Upgrades Project; and an increase of $3.1 million to an existing agreement with Carollo Engineers Inc. for a new not-to-exceed amount of $4.4 million to serve as the owner’s advisor through the Phase 1 design-build agreement; the General Manager has determined that the proposed action is exempt or otherwise not subject to CEQA</description><pubDate>Mon, 03 Aug 2026 22:03:10 GMT</pubDate></item></channel></rss>